Fuzzy-multi-mode Resource-constrained Discrete Time-cost-resource Optimization in Project Scheduling Using ENSCBO
Author(s): |
Ali Kaveh
Farivar Rajabi |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Periodica Polytechnica Civil Engineering, 2022, n. 1, v. 66 |
DOI: | 10.3311/ppci.19145 |
- About this
data sheet - Reference-ID
10631696 - Published on:
01/10/2021 - Last updated on:
27/09/2022