0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects

This publication has been cited in the following 29 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10371873
  • Published on:
    29/08/2019
  • Last updated on:
    29/08/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine