Fuzzy AHP Model for Prequalification of Engineering Consultants in the Iranian Public Procurement System
Author(s): |
Ahad Nazari
Shaghayegh Vandadian Hamid Abdirad |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Management in Engineering (ASCE), March 2017, n. 2, v. 33 |
Page(s): | 04016042 |
DOI: | 10.1061/(asce)me.1943-5479.0000489 |
- About this
data sheet - Reference-ID
10371673 - Published on:
29/08/2019 - Last updated on:
29/08/2019