Full-span Pre-cast Launching Method (FPLM) analysis with Dynamic Simulation — Case studies of Taiwan High-Speed Rail (THSR) Project
Author(s): |
Nai-Hsin Pan
Tsung-Chih Chiu Kuei-Yen Chen |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, July 2008, n. 5, v. 17 |
Page(s): | 592-607 |
DOI: | 10.1016/j.autcon.2007.10.009 |
Structures and Projects
- About this
data sheet - Reference-ID
10188971 - Published on:
10/12/2018 - Last updated on:
10/12/2018