From the geological prognosis to the TBM drive: Planning the main construction lots of the Brenner Base Tunnel
Author(s): |
Kurt Mair am Tinkhof
Nedim Radončić Chris Reinhold Romed Insam Michael Rehbock-Sander |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Geomechanics and Tunnelling, October 2018, n. 5, v. 11 |
Page(s): | 519-529 |
DOI: | 10.1002/geot.201800031 |
Structures and Projects
- About this
data sheet - Reference-ID
10084019 - Published on:
09/10/2018 - Last updated on:
18/10/2018