0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Frequency of Change Orders in Highway Construction Using Alternate Count-Data Modeling Methods

This publication lists 32 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10165882
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine