Framework for Managing Integration Challenges of Last Planner System in IMPs
Author(s): |
Luai M. El-Sabek
Brenda Y. McCabe |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, May 2018, n. 5, v. 144 |
Page(s): | 04018022 |
DOI: | 10.1061/(asce)co.1943-7862.0001468 |
- About this
data sheet - Reference-ID
10155173 - Published on:
11/12/2018 - Last updated on:
11/12/2018