0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Forward-Looking State-of-the-Art Review on Earned Value Management Systems: The Disconnect between Academia and Industry

This publication lists 187 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10658024
  • Published on:
    17/02/2022
  • Last updated on:
    17/02/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine