0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Formulation and Solution Approaches to the Rail Maintenance Production Gang Scheduling Problem

Author(s): (Dept. of MIS, OM and DSC, School of Business, Univ. of Dayton, 300 College Park, Dayton, OH 45469-2130 (corresponding author).)
(Dept. of MIS, OM and DSC, School of Business, Univ. of Dayton, 300 College Park, Dayton, OH 45469-2130 (corresponding author).)
Medium: journal article
Language(s): English
Published in: Journal of Transportation Engineering, , n. 8, v. 136
Page(s): 701-708
DOI: 10.1061/(asce)0733-947x(2010)136:8(701)
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)0733-947x(2010)136:8(701).
  • About this
    data sheet
  • Reference-ID
    10635145
  • Published on:
    29/11/2021
  • Last updated on:
    29/11/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine