0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Forecasting and controlling two main failure mechanisms in the Middle East’s longest highway tunnel

Author(s):

Medium: journal article
Language(s): English
Published in: Engineering Failure Analysis, , v. 146
Page(s): 107091
DOI: 10.1016/j.engfailanal.2023.107091
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.engfailanal.2023.107091.
  • About this
    data sheet
  • Reference-ID
    10776937
  • Published on:
    12/05/2024
  • Last updated on:
    12/05/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine