Fly ash-amended pervious concrete pavement followed by bamboo bioretention basin with Dracaena sanderiana for urban stormwater runoff control
Author(s): |
Vincent Hwang
Amber Masters Marleisa Arocho Sangchul Hwang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Construction and Building Materials, February 2017, v. 132 |
Page(s): | 161-169 |
DOI: | 10.1016/j.conbuildmat.2016.11.134 |
- About this
data sheet - Reference-ID
10247392 - Published on:
15/12/2018 - Last updated on:
15/12/2018