Fleet management for earthmoving operation in the phase of detail estimation using mixed integer nonlinear programming

Author(s): (Department of Architectural Engineering, Inha University, Incheon, South Korea)
(Department of Architectural Engineering, Inha University, Incheon, South Korea)
(Department of Architectural Engineering, Inha University, Incheon, South Korea)
(Department of Architectural Engineering, Inha University, Incheon, South Korea)
(Department of Architectural Engineering, Inha University, Incheon, South Korea)
Medium: journal article
Language(s): English
Published in: Journal of Asian Architecture and Building Engineering
Page(s): 1-16
DOI: 10.1080/13467581.2024.2320321
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/13467581.2024.2320321.
  • About this
    data sheet
  • Reference-ID
    10774180
  • Published on:
    29/04/2024
  • Last updated on:
    29/04/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine