Five Project-Duration Control Methods in Time Units: Case Study of a Linearly Distributed Planned Value
Author(s): |
Waldevique Franco Borges
Poueri do Carmo Mário |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, June 2017, n. 6, v. 143 |
Page(s): | 05017002 |
DOI: | 10.1061/(asce)co.1943-7862.0001280 |
- About this
data sheet - Reference-ID
10171021 - Published on:
11/12/2018 - Last updated on:
11/12/2018