0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Financial Consequences of Delaying Pavement Rehabilitation: Case Study Using LTPP Data

Author(s): (School of Civil and Transportation Engineering, Beijing Univ. of Civil Engineering and Architecture, 1 Zhanlanguan Rd., Beijing, China.)
(Associate Professor, Dept. of Civil and Environmental Engineering, Georgia Institute of Technology, 210 Technology Circle, Savannah, GA 31407; and Changjiang Scholar, Chang’an Univ., Xi’an, China (corresponding author).)
Medium: journal article
Language(s): English
Published in: Journal of Transportation Engineering, , n. 8, v. 138
Page(s): 975-982
DOI: 10.1061/(asce)te.1943-5436.0000387
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)te.1943-5436.0000387.
  • About this
    data sheet
  • Reference-ID
    10635419
  • Published on:
    29/11/2021
  • Last updated on:
    29/11/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine