0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Financial Analysis for Replacement of Construction Equipment in Saudi Arabia

Author(s):
Medium: journal article
Language(s): English
Published in: Australasian Journal of Construction Economics and Building, , n. 1, v. 5
Page(s): 16-22
DOI: 10.5130/ajceb.v5i1.2939
Abstract:

This study report results of a survey conducted in the EasternProvince of Saudi Arabia to explore the procedures and financialtechniques that large-size contractors utilise in replacingequipment. The results indicated that contractors set severalreplacement alternatives that they evaluate by using a set ofvarious qualitative and quantitative factors. The contractors’business objectives, employee safety and morale, and, contractors’image in the industry were found to be the most influentialqualitative factors affecting the decision of equipment replacement.Inflation, downtime, obsolescence, salvage value, and depreciationare among the top quantitative factors that contractors considerwhile making a decision to replace equipment. Because of theirsimplicity and practicality, the net present value, payback period,and the economic life are the most popular techniques that areutilised for analysing the financial issues of proposed replacementalternatives.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5130/ajceb.v5i1.2939.
  • About this
    data sheet
  • Reference-ID
    10338734
  • Published on:
    05/08/2019
  • Last updated on:
    05/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine