Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms
Author(s): |
Ashraf M. Elazouni
Fikry Gomaa Metwally |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, April 2005, n. 4, v. 131 |
Page(s): | 400-412 |
DOI: | 10.1061/(asce)0733-9364(2005)131:4(400) |
- About this
data sheet - Reference-ID
10155952 - Published on:
11/12/2018 - Last updated on:
11/12/2018