Feasibility study on the solution of replacing track slab with lateral pushing rail in one maintenance window time
Author(s): |
Xin Wang
Yu Ding Jingcun Zhao Lei Ji Chenchen Mao Yingbin Zhuang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Construction and Building Materials, January 2023, v. 362 |
Page(s): | 129658 |
DOI: | 10.1016/j.conbuildmat.2022.129658 |
- About this
data sheet - Reference-ID
10698553 - Published on:
10/12/2022 - Last updated on:
10/12/2022