0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

FBGs Real-Time Impact Damage Monitoring System of GFRP Beam Based on CC-LSL Algorithm

This publication lists 42 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10352234
  • Published on:
    14/08/2019
  • Last updated on:
    14/08/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine