0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Falsework economy

A creative approach to construction engineering of a new bridge in the SUA is expected to deliver significant time and cost savings

Author(s):

Medium: journal article
Language(s): English
Published in: Bridge Design & Engineering, , n. 56, v. 15
Page(s): 50, 52

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10048597
  • Published on:
    07/12/2009
  • Last updated on:
    30/09/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine