0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Factors influencing Time and Cost Overruns on Freeform Construction Projects

Author(s):


Medium: journal article
Language(s): English
Published in: KSCE Journal of Civil Engineering, , n. 4, v. 23
Page(s): 1442-1450
DOI: 10.1007/s12205-019-0447-x
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s12205-019-0447-x.
  • About this
    data sheet
  • Reference-ID
    10301172
  • Published on:
    29/06/2019
  • Last updated on:
    29/06/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine