0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects

This publication has been cited in the following 76 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10371791
  • Published on:
    29/08/2019
  • Last updated on:
    29/08/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine