0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Extradosed cable‐stayed Pelješac Bridge in Croatia – Fabrication of steel box girders and on‐site installation

Author(s): (China Road and Bridge Corporation (CRBC) Branch Zagreb Trg Dražena Petrovića 3 10000 Zagreb Croatia)
(China Road and Bridge Corporation (CRBC) Branch Zagreb Trg Dražena Petrovića 3 10000 Zagreb Croatia)
(Shanghai Zhenhua Heavy Industries Company Limited (ZPMC) No.3261 Dongfang Road, Pudong New Area Shanghai 200125 China)
(China Railway Baoji Bridge Group Co., Ltd (CRBBG) Xinba, Guangling Yangzhou 225002 China)
Medium: journal article
Language(s): German
Published in: Steel Construction, , n. 1, v. 15
Page(s): 26-32
DOI: 10.1002/stco.202100024
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/stco.202100024.
  • About this
    data sheet
  • Reference-ID
    10656557
  • Published on:
    17/02/2022
  • Last updated on:
    24/02/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine