0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Extensions of the resource-constrained project scheduling problem

Author(s):


Medium: journal article
Language(s): English
Published in: Automation in Construction, , v. 153
Page(s): 104958
DOI: 10.1016/j.autcon.2023.104958
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.autcon.2023.104958.
  • About this
    data sheet
  • Reference-ID
    10731535
  • Published on:
    13/06/2023
  • Last updated on:
    13/06/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine