0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Extended discharge time of ready-mixed concrete: Myth or necessity?

Author(s): ORCID
ORCID
ORCID
Medium: journal article
Language(s): English
Published in: Construction and Building Materials, , v. 437
Page(s): 136913
DOI: 10.1016/j.conbuildmat.2024.136913
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.conbuildmat.2024.136913.
  • About this
    data sheet
  • Reference-ID
    10786619
  • Published on:
    20/06/2024
  • Last updated on:
    20/06/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine