0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Exploring the Properties of Cost Overrun Risk Propagation Network (corpn) for Promoting Cost Management

This publication lists 54 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10354186
  • Published on:
    13/08/2019
  • Last updated on:
    13/08/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine