0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Exploring the Impacts of Change Orders on Performance of Construction Projects in Saudi Arabia

This publication lists 28 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10698174
  • Published on:
    11/12/2022
  • Last updated on:
    15/02/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine