0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Explicit Time-Dependent Multi-Hazard Cost Analysis Based on Parameterized Demand Models for the Optimum Design of Bridge Structures

Author(s):

Medium: journal article
Language(s): English
Published in: Computer-Aided Civil and Infrastructure Engineering, , n. 7, v. 30
Page(s): 541-554
DOI: 10.1111/mice.12131
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1111/mice.12131.
  • About this
    data sheet
  • Reference-ID
    10415562
  • Published on:
    05/03/2020
  • Last updated on:
    05/03/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine