Explicit Time-Dependent Multi-Hazard Cost Analysis Based on Parameterized Demand Models for the Optimum Design of Bridge Structures
Author(s): |
Vahid Bisadi
Jamie E. Padgett |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Computer-Aided Civil and Infrastructure Engineering, June 2015, n. 7, v. 30 |
Page(s): | 541-554 |
DOI: | 10.1111/mice.12131 |
- About this
data sheet - Reference-ID
10415562 - Published on:
05/03/2020 - Last updated on:
05/03/2020