0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Explaining Delays in Construction Arbitration: A Process-Control Model Approach

Author(s): ORCID (Ph.D. Candidate and Lecturer, Dept. of Construction Management, Jomo Kenyatta Univ. of Agriculture and Technology, P.O. Box 62000-00200, Nairobi, Kenya (corresponding author))
(Senior Lecturer, Dept. of Construction Management, Jomo Kenyatta Univ. of Agriculture and Technology, P.O. Box 62000-00200, Nairobi, Kenya.)
(Senior Lecturer, School of Law, Univ. of Nairobi, P.O. Box 30197-00100, Nairobi, Kenya.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 2, v. 12
Page(s): 04520003
DOI: 10.1061/(asce)la.1943-4170.0000371
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000371.
  • About this
    data sheet
  • Reference-ID
    10580019
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine