0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Explaining Cost Overrun Causation in Transport Projects: Drawing on Evidential Pluralism to Develop Theory

This publication lists 22 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10808100
  • Published on:
    17/01/2025
  • Last updated on:
    17/01/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine