Expanding Finance-Based Scheduling to Devise Overall-Optimized Project Schedules
Author(s): |
Ashraf M. Elazouni
Fikry G. Metwally |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, January 2007, n. 1, v. 133 |
Page(s): | 86-90 |
DOI: | 10.1061/(asce)0733-9364(2007)133:1(86) |
- About this
data sheet - Reference-ID
10162529 - Published on:
07/12/2018 - Last updated on:
07/12/2018