0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Excessive groundwater inflow during TBM tunneling in limestone formation

Author(s):

Medium: journal article
Language(s): English
Published in: Tunnelling and Underground Space Technology, , v. 96
Page(s): 103217
DOI: 10.1016/j.tust.2019.103217
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.tust.2019.103217.
  • About this
    data sheet
  • Reference-ID
    10400538
  • Published on:
    12/12/2019
  • Last updated on:
    12/12/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine