0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Examination of Project Duration, Project Intensity, and Timing of Cost Certainty in Highway Project Delivery Methods

This publication lists 39 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10371496
  • Published on:
    29/08/2019
  • Last updated on:
    29/08/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine