Exact Algorithm for Solving Project Scheduling Problems under Multiple Resource Constraints
Author(s): |
Genmou Jiang
Jonathan Shi |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, September 2005, n. 9, v. 131 |
Page(s): | 986-992 |
DOI: | 10.1061/(asce)0733-9364(2005)131:9(986) |
- About this
data sheet - Reference-ID
10161082 - Published on:
07/12/2018 - Last updated on:
07/12/2018