0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Ex ante required rates of return and related factors in Indonesian PPP infrastructure projects

Author(s): ORCID
Medium: journal article
Language(s): English
Published in: Built Environment Project and Asset Management, , n. 2, v. 14
Page(s): 228-243
DOI: 10.1108/bepam-06-2023-0113
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/bepam-06-2023-0113.
  • About this
    data sheet
  • Reference-ID
    10754859
  • Published on:
    14/01/2024
  • Last updated on:
    25/04/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine