0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Evolvement of Excusable Delay Clauses in Government Contracts since the COVID-19 Pandemic

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/jladah.ladr-1059.
  • About this
    data sheet
  • Reference-ID
    10756194
  • Published on:
    14/01/2024
  • Last updated on:
    14/01/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine