0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Evolution of Forensic Delay Analysis: A Literature Review Investigating Changes and Progress in Project Management Approaches to Delay Measurement

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/jladah.ladr-897.
  • About this
    data sheet
  • Reference-ID
    10745940
  • Published on:
    28/10/2023
  • Last updated on:
    28/10/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine