0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Evaluation of the Usage of Geothermal Energy In the Hot Water Boiler Room Stred I.

Author(s):
Medium: journal article
Language(s): English
Published in: Czech Journal of Civil Engineering (CJCE), , n. 1, v. 7
Page(s): 27-34
DOI: 10.51704/cjce.2021.vol7.iss01.pp27-34
Abstract:

The dominant source of energy in the hot water boiler house Stred I. in Velky Meder is geothermal energy, which is drawn from the VM -1 well, which was drilled in its courtyard in 2015. Based on documents and personal inspections of this boiler room, I created a geothermal circuit scheme of this hot water boiler room, where the experimental measurements took place. Part of this paper is a diagram of the geothermal circuit, a comparison of measured values ​​within a selected characteristic day for summer and winter operation in 2020. Finally, the operation of the usage of geothermal energy in the hot water boiler room Stred I. is evaluated on all these indicators.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.51704/cjce.2021.vol7.iss01.pp27-34.
  • About this
    data sheet
  • Reference-ID
    10706711
  • Published on:
    12/09/2023
  • Last updated on:
    12/09/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine