Evaluation of the Resource-Constrained Critical Path Method Algorithms
Author(s): |
Kyunghwan Kim
Jesus M. De La Garza |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, May 2005, n. 5, v. 131 |
Page(s): | 522-532 |
DOI: | 10.1061/(asce)0733-9364(2005)131:5(522) |
- About this
data sheet - Reference-ID
10161049 - Published on:
07/12/2018 - Last updated on:
07/12/2018