0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Evaluation of the geological condition ahead of the tunnel face by geostatistical techniques using TBM driving data

This publication has been cited in the following 17 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10123973
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine