0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects

This publication has been cited in the following 67 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10165844
  • Published on:
    11/12/2018
  • Last updated on:
    11/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine