0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan – a case study

Author(s):


Medium: journal article
Language(s): English
Published in: KSCE Journal of Civil Engineering, , n. 5, v. 20
Page(s): 1613-1620
DOI: 10.1007/s12205-015-0348-6

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s12205-015-0348-6.
  • About this
    data sheet
  • Reference-ID
    10172867
  • Published on:
    11/12/2018
  • Last updated on:
    11/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine