Evaluation of Influencing Factors on the Supply Chain of Prefabricated Buildings under Engineering Procurement Construction Model: A Case Study in China
Author(s): |
Jin Gao
Wan-Hua Zhao Wen-Hai Liu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Buildings, 19 June 2024, n. 6, v. 14 |
Page(s): | 1680 |
DOI: | 10.3390/buildings14061680 |
Abstract: |
With strong support from national and local government policies for prefabricated buildings, China’s prefabricated buildings have entered a period of rapid development. This article analyses the literature from various countries and establishes a structural model of the prefabricated building supply chain under the Engineering Procurement Construction (EPC) mode. It analyzes the factors that affect the prefabricated building supply chain under the EPC model from eight aspects: design stage, prefabricated component production and manufacturing stage, procurement stage, and EPC general contracting stage, etc. Then, it establishes an AHP fuzzy comprehensive evaluation model that combines qualitative and quantitative methods to evaluate the entire lifecycle supply chain of prefabricated buildings, providing reference for the robustness and resilience evaluation of prefabricated building supply chains, and further achieving green management of cost reduction and efficiency improvement in prefabricated building supply chains. |
Copyright: | © 2024 by the authors; licensee MDPI, Basel, Switzerland. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
0.96 MB
- About this
data sheet - Reference-ID
10787514 - Published on:
20/06/2024 - Last updated on:
20/06/2024