Evaluation of Cable Force Changes Effects on Cable Stayed Bridge

Author(s):

Medium: journal article
Language(s): English
Published in: Civil Engineering Journal, , n. 11, v. 6
Page(s): 2159-2174
DOI: 10.28991/cej-2020-03091609
Abstract:

The proposed bridge, which is cable stayed bridge crosses the Hlaing River that flows through Western Yangon. It was completed in 2000 and is currently used to connect Insein Township with Hlaing Tharyar Township. It has the 20 years’ service life. It requires the inspection and the evaluation of the real condition of the structure. As cable element plays an important role in cable structures, evaluation of the real state of the stay cable is one of the main focuses of the cable stayed bridge. Firstly, in the research work all cables are inspected to evaluate the current condition of the cables with included visual inspection and vibration-based cable force measurement method. With the help of static and moving load analysis, the effect of force change cables in which the successive force changes are considered, and the possible cable loss effect on the structural behavior of the bridge are also investigated. The finite element model of the cable stayed bridge is developed based on the geometric shape and material properties from MOC and is modelled with finite element software MIDAS Civil. The tension forces obtained by inspection over years (2000 to 2018) using vibration-based measurements method are compared with the measured intact cable forces. According to the results of the data analysis, it is observed that the cables force variations of the seven cables are abnormal conditions. In order to evaluate the condition of a bridge effected by cable force variation, the two parameters are considered; percentage increase in tension stress of all cables and percentage increase in deflection of the deck. The present study describes the structural response of the bridge in order to evaluate the actual safety of the bridge with abnormal force change cables, and also examines the consequences of one cable failure. 

Copyright: © 2020 Theint Theint Thu Soe, San Yu Khaing
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10475523
  • Published on:
    13/11/2020
  • Last updated on:
    02/06/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine