An Evaluation of a Predictive Conceptual Method for Contract Time Determination on Highway Projects Based on Project Types
Author(s): |
George Okere
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | International Journal of Civil Engineering, July 2019, n. 7, v. 17 |
Page(s): | 1057-1073 |
DOI: | 10.1007/s40999-018-0357-1 |
- About this
data sheet - Reference-ID
10330107 - Published on:
26/07/2019 - Last updated on:
26/07/2019