0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Evaluating the Performance of Taiwan Airport Renovation Projects: An Application of Multiple Attributes Intelligent Decision Analysis

Author(s): ORCID
ORCID

ORCID
Medium: journal article
Language(s): English
Published in: Buildings, , n. 10, v. 14
Page(s): 3314
DOI: 10.3390/buildings14103314
Abstract:

Performance evaluation is a vital tool for measuring whether construction projects meet their established objectives, particularly in complex tasks. It helps identify key areas for improvement and enhances resource allocation efficiency. Through precise performance evaluation, managers can make optimal decisions regarding resource use, ultimately increasing project productivity and overall performance. The objective of this study is to measure the production efficiency of airport renovation projects in Taiwan using data envelopment analysis (DEA) and to apply artificial neural networks (ANN) for predicting project quality. DEA effectively handles scenarios with multiple inputs and outputs, providing relative efficiency comparisons among projects and quantifying the potential for improvement. ANN, on the other hand, can learn nonlinear patterns from the data, allowing for accurate predictions of project quality. As construction projects become more complex, ensuring efficient operation within limited resources becomes increasingly crucial. Traditional performance evaluation methods are inadequate for addressing scenarios involving multiple inputs and outputs; therefore, using DEA and ANN offers a more accurate framework for analysis and prediction. The results of this study indicate that, through the DEA model, five projects achieved an efficiency score of 1, while twelve inefficient projects need to reduce defect frequency by 54.76% and increase the progress and budget implementation efficiency by an average of 10.33% to improve performance. The ANN model achieved a classification accuracy of 94.1% and a mean squared error (MSE) of 0.11 in regression predictions. By adopting a data-driven approach, ANN facilitates intelligent decision making and forecasting throughout the construction process. This study provides construction managers with concrete guidelines for resource allocation and quality prediction, thus enhancing project management effectiveness.

Copyright: © 2024 by the authors; licensee MDPI, Basel, Switzerland.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10804597
  • Published on:
    10/11/2024
  • Last updated on:
    25/01/2025
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine