Evaluating the allocation of contingency on state DOT projects based on project types and rate of cost overruns

Author(s):
Medium: journal article
Language(s): English
Published in: Asian Journal of Civil Engineering, , n. 4, v. 19
Page(s): 463-472
DOI: 10.1007/s42107-018-0042-3
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s42107-018-0042-3.