0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Evaluating responsive gateways amid future uncertainty at the London Bridge station (UK)

Author(s): (Département Planification, Transports Publics Fribourgeois Trafic SA, Givisiez, Switzerland)
(Laboratory for Future-ready Infrastructure, School of Construction Management Technology, Purdue University, West Lafayette, IN, USA)
(Infrastructure Management Group, Institute of Construction and Infrastructure Management, ETH Zürich, Zurich, Switzerland)
(Infrastructure Management Group, Institute of Construction and Infrastructure Management, ETH Zürich, Zurich, Switzerland)
Medium: journal article
Language(s): English
Published in: Infrastructure Asset Management, , n. 2, v. 11
Page(s): 1-19
DOI: 10.1680/jinam.23.00026
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1680/jinam.23.00026.
  • About this
    data sheet
  • Reference-ID
    10775254
  • Published on:
    29/04/2024
  • Last updated on:
    20/06/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine