0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Evaluating construction delays using productivity-based resource reallocation for economic feasibility

This publication lists 21 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10658423
  • Published on:
    17/02/2022
  • Last updated on:
    10/02/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine