0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Estudio del efecto de la estimación del tiempo y el tamaño del búfer de proyecto en el Método de la Cadena Crítica = Study of the effect of tasks duration and project buffer size estimation in the Critical Chain Method

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.20868/ade.2019.3910.
  • About this
    data sheet
  • Reference-ID
    10321991
  • Published on:
    12/07/2019
  • Last updated on:
    24/07/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine