Estimating productivity using simulation
A case study of Gaza beach embankment protection project
Author(s): |
R. N. Rustom
A. Yahia |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Construction Innovation, April 2007, n. 2, v. 7 |
Page(s): | 167-186 |
DOI: | 10.1108/14714170710738531 |
- About this
data sheet - Reference-ID
10325559 - Published on:
21/07/2019 - Last updated on:
21/07/2019